In mid-July, you close your laptop for three weeks. The autoresponder is on, the last email is sent, and you drive off thinking your portfolio is taking a break too. It isn't. Somewhere in those three weeks a pipe bursts, a boiler fails, or a tenant locks themselves out. The question isn't whether it happens, but who the tenant gets on the phone when it does.
An emergency repair doesn't care about your holiday planning. A tenant left without water on a scorching Tuesday won't calmly wait until you're back at your desk in mid-August. They call, and if they can't reach anyone, they call someone else. That's exactly the moment a manageable report turns into a case file.
The annoying thing is that this comes back every year and can't be solved by simply "planning well". You can postpone maintenance, but you don't choose when something breaks down. And in the very period you're away, your regular contractor often is too.
Your contractor is on holiday too
In 2026, the bouwvak (the Dutch construction industry's collective summer holiday) doesn't fall in a single week, but shifts by region across more than a month. In the northern region, the bouwvak runs from 20 July to 7 August, in the southern region from 27 July to 14 August, and in the central region from 3 to 21 August. Add the separate holidays of self-employed tradespeople on top of that, and your regular maintenance partner has limited availability for much of the summer.
So the gap isn't only on your side. At the moment a tenant reports an emergency repair, you might be away and your usual contractor might have just started their bouwvak. Who picks up the phone then, and who can actually come round, isn't a detail, it's the core of your summer planning.
What happens if no one picks up the emergency repair
A tenant who can't reach you has more options than you might think. For a genuinely urgent defect, a burst pipe or a failed heating system, they don't first have to formally put you in default, according to the Dutch central government. In urgent cases, they're allowed to hire a repair contractor themselves and recover the costs from you. The Woonbond (the Dutch tenants' association) actively points tenants towards that route too. Your being unreachable doesn't then determine whether action is taken, only who chooses the contractor and at what rate.
Since 2024 there's a second way out. Every municipality has a meldpunt goed verhuurderschap (a municipal reporting point for responsible landlordship) where a tenant can lodge a complaint about their landlord, and those reports are passed on to the municipality within two working days. A tenant who can't get hold of anyone for three days about a leak therefore has a low-threshold place to make their dissatisfaction official. A report you could have caught in five minutes suddenly ends up with the municipality.
Set the escalation route before you leave
The solution isn't setting up an expensive 24-hour service, but recording a short decision in advance that your colleague or an external call centre can act on without you. Three things make the difference.
Agree who handles the first line and with what mandate. A stand-in who's only allowed to log and pass on the report solves nothing. Give them the authority to call in a contractor directly, up to an agreed amount, for a defined list of emergencies: a leak, no hot water, no power, or a blocked front door.
Record which contractor may come round straight away for which type of report, with a second name in case the first is in the bouwvak. Without that second name, your stand-in is still left empty handed.
Finally, decide when a tenant can simply wait until Monday, and when you want to be called yourself. Not every report is urgent, and not every urgent case needs to land on your desk. The difference between a peaceful holiday and a phone ringing on the beach lies in how clearly you draw that line beforehand.
What a tenant remembers isn't that you were away for three weeks. It's whether someone answered when things went wrong. An emergency repair that's neatly handled on day two of your holiday, by someone who knew what they were allowed to decide, costs you a text message. The same report without an arrangement in place costs you an unhappy tenant, an unfamiliar invoice, and in the worst case a line in the municipal reporting point. The only difference is a decision tree you put on paper before you leave.
See what automatic ticket handling feels like
We are almost ready to let in our first property managers. Leave your details and we will be in touch the moment we open up.
Already have an account? Log in




